Waterwatch Data Portal
ME_YYR808 Reedy Billabong East
19 September 2013
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Reedy Billabong East ME_YYR808 |
Date and Time | Thursday 19th September 2013 10:20am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.59 | 1.8 | 490 | 7.1 | 0.14 | 15 | 13 | 19 | 9 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours 10 |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | Scummy |
Stream depth | 51cm - 99cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
10% duckweed cover. Large amount of decomposing plant matter. The Boulevard Drain stormwater is now flowing into underwater storage tank. No drain stormwater flowing into Reedy Billabong.
Creatures Waterwatch method
Total bug score | ||
---|---|---|
Total abundance | 0 - 35 | 35+ |
0 - 200 | Poor | Good |
200+ | Fair | Very good |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au