Site visit details

Overview

Catchment Yarra River
Site Karingal Creek, crn Susan and Brougham St, Eltham ME_YDI847
Date and Time Tuesday 24th September 2013 15:15pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.15 8 670 8.7 0.08 24.3 15.6 19
Weather overcast
Last rainfall During the last week 42.6
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Stained brown,Other: see Comments
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants plastic
There was a very noticeable reddish-tan discharge coming from the underground area. It may well have been the reason for the high Ammonium level here today, though it looks like it only affected the turbidity a small amount, and the other paramaters not much either.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au