Waterwatch Data Portal
EG_FOR Forge Creek, Barkhill Rd - Site 4
27 September 2013
Site visit details
Overview
Catchment | Lake Victoria |
---|---|
Site | Forge Creek, Barkhill Rd - Site 4 EG_FOR |
Date and Time | Friday 27th September 2013 10:28am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 635 | 6.79 | 0.65 | 21.1 | 15.9 | 18 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours 7.1 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Scummy,Stained brown,Other: green scum |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | other |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au