Waterwatch Data Portal
GB_SUG018 Sugarloaf Creek at Pyalong-Tallarook Rd
23 September 2013
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Sugarloaf Creek at Pyalong-Tallarook Rd GB_SUG018 |
Date and Time | Monday 23rd September 2013 09:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 548 | 410 | 7.6 | 1.4 | 14.6 | 14.9 | 2420 | 32 |
Weather | sunny |
---|---|
Last rainfall | During the last week 52 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
Muddy/brown. Water level has been up about 4 metres higher since last sample run in August. Evidence with flattened grass and debris.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au