Site visit details

Overview

Catchment Ovens River
Site King River, Kaluna Park NE_KIN050
Date and Time Friday 27th September 2013 10:10am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Water ° C P mg/L Turb NTU
Sample 74.7 7.46 55 6.2 0.006 15.5 33
Weather sunny
Last rainfall During the last 24 hours
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants
Showers within last 24 hours

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Fair 3 Fair 6 Good 8 Fair 3 Fair 6 Fair 26

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au