Waterwatch Data Portal
EG_FOR070 Forge Creek, Corrins Rd above causeway - Site 5
25 October 2013
Site visit details
Overview
Catchment | Lake Victoria |
---|---|
Site | Forge Creek, Corrins Rd above causeway - Site 5 EG_FOR070 |
Date and Time | Friday 25th October 2013 16:23pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 1245 | 6.63 | 0.16 | 19.1 | 15.8 | 19 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours 1.4 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Stained brown,Other: Heavy pink/green plant growth over whole surface |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au