Waterwatch Data Portal
EG_NRB091 Nicholson River Backwater - 500m upstream @ bottom (at fence)
26 November 2013
Site visit details
Overview
Catchment | Nicholson River |
---|---|
Site | Nicholson River Backwater - 500m upstream @ bottom (at fence) EG_NRB091 |
Date and Time | Tuesday 26th November 2013 08:50am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Secchi m | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 67.1 | 10250 | 0.03 | 14 | 18.8 | 40 |
Weather | sunny |
---|---|
Last rainfall | During the last week 25 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Muddy |
Stream depth | 1.3 |
Stream width | |
Hazards | |
Litter/Pollutants |
very dirty water 2 knot ne wind
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au