Waterwatch Data Portal
ME_YWW055 South side of Wurundjeri Walk, about halfway down Wurundjeri Walk, 5m east of notice board, Immed upstream where creek goes into drain near Fulton Rd.
23 November 2013
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | South side of Wurundjeri Walk, about halfway down Wurundjeri Walk, 5m east of notice board, Immed upstream where creek goes into drain near Fulton Rd. ME_YWW055 |
Date and Time | Saturday 23rd November 2013 15:00pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 85 | 7.7 | 6.8 | 0.07 | 20 | 19 | 29 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | plastic |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au