Site visit details

Overview

Catchment Mallee
Site Brickworks Billabong at Regulator MA_BBW001
Date and Time Monday 9th December 2013 11:00am
Approved Approved

Notes

Physical Chemical Tests

D.O mg/L EC µS/cm pH pH Units Water ° C
Sample 25900 8.4 22.4
Weather sunny
Last rainfall During the last week 51
Flow estimate PERMANENT: wetlands and lakes
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Hi David, The EC measurement got an 'Or' reading which we realized meant 'Out of range' We mixed the sample 50/50 with distilled water and got a reading of 12.95. Assuming we could double the reading the result we entered was 25.90 (25900 µS/cm) Regards, Len & Rae Jeffers

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au