Waterwatch Data Portal
GB_YEA025 Yea River after Yea at Providence Bridge
30 August 2013
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Yea River after Yea at Providence Bridge GB_YEA025 |
Date and Time | Friday 30th August 2013 16:30pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 8 | 35 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Very muddy at the moment and lots of fallen trees in it, and a little rubbish.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au