Waterwatch Data Portal
GB_TRE010 Threlful Creek at Creightons Creek
15 September 2013
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Threlful Creek at Creightons Creek GB_TRE010 |
Date and Time | Sunday 15th September 2013 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 130 | 6.6 | 7 | 0.02 | 15 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall ~ 60mm from 18th August to end of August. 5 mm in September to date. EC is the same or higher at all sites, except JIM010 which is much lower. Turbidity lower at all sites, JIM010 almost 3 times.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au