Site visit details

Overview

Catchment Goulburn River
Site Creightons Creek at Longwood Mansfield Road GB_CRE014
Date and Time Sunday 15th September 2013 12:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 180 7.1 21
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Rainfall ~ 60mm from 18th August to end of August. 5 mm in September to date. EC is the same or higher at all sites, except JIM010 which is much lower. Turbidity lower at all sites, JIM010 almost 3 times.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au