Waterwatch Data Portal
ME_ECN300 Cannibal Creek at Garfield North Rd, Garfield North
28 December 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Cannibal Creek at Garfield North Rd, Garfield North ME_ECN300 |
Date and Time | Saturday 28th December 2013 10:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 160 | 6.7 | 0.03 | 21 | 18 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week 4 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants | cans,paper,plastic |
No changes from last time. This monitoring was done 3 weeks late. These results sort of reflect the spring period.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au