Waterwatch Data Portal
ME_ECN500 Cannibal Creek at Wimpole Rd, Garfield North
28 December 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Cannibal Creek at Wimpole Rd, Garfield North ME_ECN500 |
Date and Time | Saturday 28th December 2013 11:08am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 183 | 6.8 | 0.08 | 24 | 18 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week 4 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
Bull rushes on west side of bridge are more numerous and come right up to the edge of the bridge. I heard a big loud splash underneath the bridge. Possibly a platypus? This monitoring was done 3 weeks late. These results sort of reflect the spring period.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au