Site visit details

Overview

Catchment Mallee
Site Lake Ranfurly @ end of 15th Street MA_LRA500
Date and Time Thursday 2nd January 2014 11:00am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Water ° C Turb NTU
Sample 567 7.1 0.4 28.6 0
Weather cloudy
Last rainfall During the last week
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width
Hazards
Litter/Pollutants
The soluble Phosphate has been measured by the dilution methodused the diluted method

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au