Waterwatch Data Portal
GB_HEY010 Upper Heyfield Creek (Tributary to Brankeet Creek)
19 October 2013
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Upper Heyfield Creek (Tributary to Brankeet Creek) GB_HEY010 |
Date and Time | Saturday 19th October 2013 14:50pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | Rain mm | Water ° C | Turb NTU | |
---|---|---|---|---|
Sample | 160 | 0 | 20.1 | 10 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Clear. Low to moderate flow - low for this time of year.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au