Site visit details

Overview

Catchment Bunyip River
Site Balcombe Creek at Augusta St Bridge, Mt Martha ME_EBA900
Date and Time Sunday 22nd December 2013 09:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 57 5 25000 7.8 0.02 22 20 10
Weather raining
Last rainfall Raining Now
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance
Stream depth 1m - 2m
Stream width >5m
Hazards
Litter/Pollutants
Phosphate level increase EC dramatic increase due to tidal influence. Occurred in January 2013 estimate conductivity at 750,000 us.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au