Waterwatch Data Portal
GB_HUG015 Hughes Creek opp end of Watson St - 500m downstream from Bluestone Bridge, Seymour Avenel Rd, Avenel
8 February 2014
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Hughes Creek opp end of Watson St - 500m downstream from Bluestone Bridge, Seymour Avenel Rd, Avenel GB_HUG015 |
Date and Time | Saturday 8th February 2014 11:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 700 | 0 | 41.2 | 25.5 | 45 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago 12.6 |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | <2 |
Hazards | |
Litter/Pollutants |
Hi Kirsten, I'm not sure that the EC value for this data is correct. I did test the water three times as it seemed high but all three times, with re-calibration, the same result was achieved. Maybe this is a good excuse for us to have a coffee and check out my EC meter? Hope you are well, Ellen KJH visited Ellen 7-3-14 and checked her meter, which is okay. Tested against mine and both reading the same. Also looked at historical data and have been results similar at same time of the year at site downstream. All okay. Site was stagnant disconnected pools with reduced water level when sample was taken, which has likely caused concentrated EC result.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au