Site visit details

Overview

Catchment Goulburn River
Site Hughes Creek opp end of Watson St - 500m downstream from Bluestone Bridge, Seymour Avenel Rd, Avenel GB_HUG015
Date and Time Saturday 8th February 2014 11:00am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 700 0 41.2 25.5 45
Weather sunny
Last rainfall More than a week ago 12.6
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width <2
Hazards
Litter/Pollutants
Hi Kirsten, I'm not sure that the EC value for this data is correct. I did test the water three times as it seemed high but all three times, with re-calibration, the same result was achieved. Maybe this is a good excuse for us to have a coffee and check out my EC meter? Hope you are well, Ellen KJH visited Ellen 7-3-14 and checked her meter, which is okay. Tested against mine and both reading the same. Also looked at historical data and have been results similar at same time of the year at site downstream. All okay. Site was stagnant disconnected pools with reduced water level when sample was taken, which has likely caused concentrated EC result.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au