Waterwatch Data Portal
GB_LBT002 Lake Bartlett - abbatoir stormwater holding dam
28 October 2013
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Lake Bartlett - abbatoir stormwater holding dam GB_LBT002 |
Date and Time | Monday 28th October 2013 13:30pm |
Approved | Approved |
Physical Chemical Tests
Chem mg/L | D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 42 | 73 | 6.8 | 2419 | 352 | 7.3 | 0.6 | 19.1 | 0.77 | 40 |
Weather | overcast |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
overcast and threatening rain very weedy and overgrown site smelly
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au