Site visit details

Overview

Catchment Goulburn River
Site Lake Bartlett near culvert at South End GB_LBT006
Date and Time Saturday 16th November 2013 11:50am
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Water ° C P mg/L Turb NTU
Sample 115 9.9 316 7.7 0.02 22.7 57
Weather sunny
Last rainfall
Flow estimate PERMANENT: wetlands and lakes
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
water level high

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au