Waterwatch Data Portal
ME_YGC100 Grace Burn at the Wallace Parade bridge, Healesville
14 March 2014
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Grace Burn at the Wallace Parade bridge, Healesville ME_YGC100 |
Date and Time | Friday 14th March 2014 09:30am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 98 | 10 | 50 | 7.1 | 0.01 | 16 | 14.4 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week 4 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | bottles,cans,clothing,packets,plastic |
We were surprised by the different ammonium results. Actually getting a reading. Not sure if this could be related to new chemicals having just updated our kit.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au