Waterwatch Data Portal
GB_DRN530 Muckatah Drain at Naring Road before Broken Creek
27 August 2013
Site visit details
Overview
Catchment | Broken River |
---|---|
Site | Muckatah Drain at Naring Road before Broken Creek GB_DRN530 |
Date and Time | Tuesday 27th August 2013 12:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | Rain mm | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 390 | 8.3 | 0 | 19 | 1.75 | 390 |
Weather | |
---|---|
Last rainfall | 0 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
L/F
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au