Site visit details

Overview

Catchment Mitchell River
Site Lind Bridge EG_MIT540
Date and Time Sunday 23rd March 2014 14:30pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 67.8 15240 7.3 0.5 18.3 19.7 9
Weather overcast
Last rainfall During the last week 16
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear,Other: grass and seeds on surface
Stream depth >2m
Stream width >5m
Hazards
Litter/Pollutants
Current flowing strongly towards lake. Mullet jumping in centre of river, 10 m downstream.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au