Site visit details

Overview

Catchment Goulburn River
Site Yea River U/S of Yea near GVW offtake GB_YEA018
Date and Time Monday 24th March 2014 00:00am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 89 8.7 64 6.7 0 15.5 0.02 23
Weather
Last rainfall 0
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
L/F

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au