Waterwatch Data Portal
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Hughes Creek on Springs Road GB_HUG002 |
Date and Time | Thursday 24th April 2014 08:31am |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | Rain mm | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 200 | 0 | 9 | 9.5 | 9 |
Weather | overcast |
---|---|
Last rainfall | More than a week ago |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
E.coli sample bottle cracked and leaked, but was decanted to new sterile bottle. When analysing, 50 ml was used, and 50ml topped up with sterile water prior to digestion, with results being multiplied by 2, by David Hodgkins.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au