Site visit details

Overview

Catchment Yarra River
Site Plenty River under Main Road (Circuit St) Bridge, Greensborough ME_YPL693
Date and Time Monday 2nd June 2014 15:00pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 10 560 7.6 0.15 14.8 12.8 21
Weather overcast
Last rainfall During the last 24 hours
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Muddy
Stream depth 1m - 2m
Stream width >5m
Hazards
Litter/Pollutants packets,paper,plastic
Ammonium still unable to be tested due to missing equipment.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au