Site visit details

Overview

Catchment South Gippsland
Site Tarwin Lower boat ramp, past pub. GC WG_TWN251
Date and Time Monday 16th January 2012 10:45am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 6800 7.2 0.4 30.1 23.3 21
Weather sunny
Last rainfall During the last week
Flow estimate
Water Appearance Muddy
Stream depth
Stream width
Hazards
Litter/Pollutants
P 1:5 dilution = 0.08 *5. High tide.

Habitat

Length of stream examined = 50m
Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Fair 3 Fair 6 VeryPoor 2 Fair 3 Poor 4 Poor 18

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au