Waterwatch Data Portal
ME_EBA900 Balcombe Creek at Augusta St Bridge, Mt Martha
27 April 2014
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcombe Creek at Augusta St Bridge, Mt Martha ME_EBA900 |
Date and Time | Sunday 27th April 2014 09:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 42 | 4 | 20000 | 7.8 | 0.07 | 16 | 17 | 0 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Stained brown |
Stream depth | 51cm - 99cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants | bottles,plastic |
large increase in EC and increase in PH. 63.5 mm rain since last visit to site. Estuary closed
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au