Site visit details

Overview

Catchment Goulburn River
Site Jims Gully at Creightons Creek GB_JIM010
Date and Time Sunday 20th April 2014 12:00pm
Approved Approved

Notes

Physical Chemical Tests

No physical chemical tests recorded on this visit
EC µS/cm pH pH Units Rain mm Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample
Weather
Last rainfall
Flow estimate DRY: No continuous flow in channel and no pools
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Site dry Rainfall: since 16/3/14 ~ 34mm in March and 75mm in second week of April. EC: lower at all sites. Dilution by rain maintained. Turbidity: lower at all sites, 10 days since rain, sediment settled.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au