Site visit details

Overview

Catchment Lake Colac
Site Lake Colac at Meredith Park, north end of lake CO_LCO060
Date and Time Monday 16th June 2014 15:15pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 9600 9 0.7 14 13.1 502
Weather windy
Last rainfall During the last 24 hours 5
Flow estimate PERMANENT: wetlands and lakes
Water Appearance Muddy
Stream depth 0 - 50cm
Stream width
Hazards
Litter/Pollutants
DO was beyond the limits of the HACH meter and dilution is not appropriate technique for DO.Winds 15-20 knts S/W Onshore.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au