Waterwatch Data Portal
ME_YGC100 Grace Burn at the Wallace Parade bridge, Healesville
18 July 2014
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Grace Burn at the Wallace Parade bridge, Healesville ME_YGC100 |
Date and Time | Friday 18th July 2014 09:30am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 86 | 10 | 70 | 6.5 | 0.03 | 8.1 | 8.6 | 18 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
Bank full flow and first time we have recorded turbidity >10
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au