Waterwatch Data Portal
ME_ECN100 Cannibal Creek at Pooley Rd, Tynong North
20 June 2014
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Cannibal Creek at Pooley Rd, Tynong North ME_ECN100 |
Date and Time | Friday 20th June 2014 08:58am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 128 | 5.7 | 0.02 | 8.5 | 9 | 15 |
Weather | sunny |
---|---|
Last rainfall | During the last week 11 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear,Stained brown |
Stream depth | 0 - 50cm |
Stream width | 1 |
Hazards | |
Litter/Pollutants | cans,packets |
This monitoring was done about 2 weeks late. These results reflect the autumn period. Naomi Dart - Waterwatch Coordinator was present. Water level was quite low. Ferns now overhanging creek where water sample taken.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au