Waterwatch Data Portal
GB_WCP003 Cussen Park Site 3 - Weir Wall, downstream
24 March 2014
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Cussen Park Site 3 - Weir Wall, downstream GB_WCP003 |
Date and Time | Monday 24th March 2014 15:50pm |
Approved | Approved |
Physical Chemical Tests
Chem mg/L | D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 97 | 8.7 | 109 | 8.1 | 0.11 | 19.9 | 19 |
Weather | sunny |
---|---|
Last rainfall | |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
new rock wall installed - height will vary from previous recorded results pump started 3.50 pm colony of fruit bats in the area slight scum on top of water
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au