Site visit details

Overview

Catchment Goulburn River
Site Cussen Park Site 3 - Weir Wall, downstream GB_WCP003
Date and Time Monday 24th March 2014 15:50pm
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L E coli orgs/100mL EC µS/cm Nitrate-Nit mg/L N pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 97 8.7 109 8.1 0.11 19.9 19
Weather sunny
Last rainfall
Flow estimate PERMANENT: wetlands and lakes
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
new rock wall installed - height will vary from previous recorded results pump started 3.50 pm colony of fruit bats in the area slight scum on top of water

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au