Site visit details

Overview

Catchment Barwon River
Site Cargerie Ck Crossing @ Concrete Bridge CO_CAR010
Date and Time Thursday 4th September 2014 14:35pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 50 6.9 4400 8 0.015 11 8 10
Weather cloudy
Last rainfall During the last 24 hours 1
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear,Scummy,Other: ribbon weed
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au