Site visit details

Overview

Catchment Bunyip River
Site Sunshine Creek at outfall to Port Phillip Bay, Mt Martha ME_ESU450
Date and Time Monday 22nd September 2014 10:43am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 73 8 2900 8.1 0.02 13 10 7
Weather sunny
Last rainfall During the last week 11
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 0.5
Hazards Steep slope by roadside, rocky ground
Litter/Pollutants bottles,packets,paper,plastic,polystyrene,other
1 bag of litter and one plastic drum removed.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au