Waterwatch Data Portal
EG_NRB091 Nicholson River Backwater - 500m upstream @ bottom (at fence)
11 November 2014
Site visit details
Overview
Catchment | Nicholson River |
---|---|
Site | Nicholson River Backwater - 500m upstream @ bottom (at fence) EG_NRB091 |
Date and Time | Tuesday 11th November 2014 09:55am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Secchi m | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 64.2 | 20050 | 5.04 | 0.01 | 16.2 | 21.1 | 20 |
Weather | overcast |
---|---|
Last rainfall | More than a week ago 5 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 1.8 |
Stream width | |
Hazards | |
Litter/Pollutants |
slight wind
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au