Waterwatch Data Portal
GB_RAM005 Ramages Creek at Blue Hills u/s Creightons Creek
20 July 2014
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Ramages Creek at Blue Hills u/s Creightons Creek GB_RAM005 |
Date and Time | Sunday 20th July 2014 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 90 | 5.8 | 16 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: from 15/6/14 to 30/6/14 had 81mm, from 1/7/14 to 20/7/14 had 80 mm. Creek level very high, so EC lower at all sites. Turbidity: about the same as June 14, except for JIM010, due to prolonged runoff removing free sediment. Low pH might be inaccurate?
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au