Site visit details

Overview

Catchment Goulburn River
Site Creightons Creek between Ramages and Baronga Creeks GB_CRE007
Date and Time Sunday 17th August 2014 12:00pm
Approved Approved

Notes

Physical Chemical Tests

E coli orgs/100mL EC µS/cm pH pH Units Rain mm Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 120 19
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Rainfall: ~26mm between 20/7/14 and 31/7/14. Almost no rain in August since 8mm on 01/08/14. EC: ~same at upper creek sites, slightly higher in lower creek sites. JIM much lower. Turbidity: down a little at most sites.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au