Waterwatch Data Portal
CO_SWA110 Lake Victoria outlet @ Bellarine Hwy
8 December 2014
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Lake Victoria outlet @ Bellarine Hwy CO_SWA110 |
Date and Time | Monday 8th December 2014 11:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 55 | 5.1 | 70000 | 8.3 | 0.03 | 19 | 19 | 0 |
Weather | overcast |
---|---|
Last rainfall | During the last week 30 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear,Stained brown |
Stream depth | 0 - 50cm |
Stream width | |
Hazards | |
Litter/Pollutants | oil |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au