Waterwatch Data Portal
CO_IND035 Harvey Park Drain (Harvey Estate Basin)
16 November 2014
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Harvey Park Drain (Harvey Estate Basin) CO_IND035 |
Date and Time | Sunday 16th November 2014 10:45am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 80 | 7.5 | 80 | 7.8 | 0.08 | 18 | 17 | 10 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 14 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au