Site visit details

Overview

Catchment Barwon River
Site Yarrowee R @ South Durham Bridge CO_YAR200
Date and Time Sunday 27th April 2014 10:00am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 90 10 930 7.2 0.15 13.5 10.7 9
Weather cloudy
Last rainfall During the last week 12
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width 9
Hazards
Litter/Pollutants

Habitat

Spring 2013 Willow removal W bank, rabbit ripping and planting - all within 300m upstream. Autumn 2014 Willow removal E bank, plants establishing from last planting Spring 2014 1000 more plants on W bank 300+ m upstream
Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Fair 3 Poor 4 Fair 6 Good 4 Poor 4 Fair 21

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au