Site visit details

Overview

Catchment Yarra River
Site Chelsworth Overflow (stormwater capture draining to Reedy Billabong) ME_YYD809
Date and Time Friday 19th December 2014 11:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.18 4.65 750 7.3 0.09 25 17.8 20 15
Weather cloudy
Last rainfall More than a week ago
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Milky
Stream depth 0 - 50cm
Stream width 1
Hazards
Litter/Pollutants
Sufficient water at collection point to obtain viable sample.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au