Site visit details

Overview

Catchment Yarra River
Site Chelsworth Input (stormwater capture draining to Reedy Billabong) ME_YYD808
Date and Time Thursday 18th September 2014 09:45am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.12 8.9 1020 7.4 0.06 10.5 11.5 8 9
Weather raining
Last rainfall Raining Now 1
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 0.1
Stream width 1
Hazards
Litter/Pollutants
No water from drains but viable sample site.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au