Waterwatch Data Portal
GB_CRE008 Creightons Creek d/s of Baronga Creek
21 December 2014
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek d/s of Baronga Creek GB_CRE008 |
Date and Time | Sunday 21st December 2014 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 150 | 11 |
Weather | |
---|---|
Last rainfall | During the last 24 hours 0 |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: ~ 10mm in November, ~ 20 mm in December EC: PEA010 and lower sites are higher than November. Turbidity: Normal, much lower than the high results of November. No runoff, so no impact of fire.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au