Waterwatch Data Portal
GB_TRE010 Threlful Creek at Creightons Creek
18 January 2015
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Threlful Creek at Creightons Creek GB_TRE010 |
Date and Time | Sunday 18th January 2015 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 160 | 6.4 | 12 | 0.12 | 18 |
Weather | |
---|---|
Last rainfall | During the last 24 hours 0 |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: 0mm in December, ~70mm between 10th and 13th of January. EC: Increase at all sites, except CRE013 and CRE014. Turbidity: ~the same. BAR010 and PEA010 lower.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au