Waterwatch Data Portal
ME_YDI810 Diamond Creek, Railway Pde, Eltham
28 February 2015
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 28th February 2015 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.07 | 3 | 280 | 6.6 | 0.03 | 21.1 | 21.8 | 27 |
Weather | raining |
---|---|
Last rainfall | Raining Now |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Muddy |
Stream depth | 0.75 |
Stream width | 10.0 |
Hazards | |
Litter/Pollutants | other |
Other litter included 2 car tyres & orange road safety mesh
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au