Waterwatch Data Portal
GB_WGS003 Outlet pit of bioremediation basin - Wetland at Gemmills Swamp
27 October 2014
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Outlet pit of bioremediation basin - Wetland at Gemmills Swamp GB_WGS003 |
Date and Time | Monday 27th October 2014 09:50am |
Approved | Approved |
Physical Chemical Tests
Chem mg/L | D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 58 | 14 | 1.2 | 7.5 | 172 | 6.5 | 16.6 | 1414 | 0.06 | 8 |
Weather | windy |
---|---|
Last rainfall | More than a week ago |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
water level medium stormy and overcast weather lots of dianella flowering
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au