Waterwatch Data Portal
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Dewings Creek CO_DEW010 |
Date and Time | Wednesday 21st January 2015 09:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 35 | 3.4 | 410 | 7 | 21 | 15 | 75 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | Scummy,Milky |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au