Waterwatch Data Portal
GB_DRY025 Dry Creek at McKenzies Bridge, Hamilton Street, Broadford
23 March 2015
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Dry Creek at McKenzies Bridge, Hamilton Street, Broadford GB_DRY025 |
Date and Time | Monday 23rd March 2015 07:46am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 350 | 0 | 16.1 | 0.17 | 23 |
Weather | overcast |
---|---|
Last rainfall | During the last week 4 |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Stained brown |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Low rainfall over two years, aquifers providing salt have dried, water in pools from runoff.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au