Site visit details

Overview

Catchment Bunyip River
Site Devilbend Reservoir, western tip, accessible by 2wd track ME_EDV300
Date and Time Thursday 19th March 2015 10:43am
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 7.5 954 0 7.6 0 26 22.8 9
Weather windy
Last rainfall More than a week ago
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear,Scummy
Stream depth 0 - 50cm
Stream width 250
Hazards soft mud as water level is lower
Litter/Pollutants
no rubbish at site.water level a lot lower. water edge very soft and muddy. no water birds in the area. very windy.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au